We take pride in transforming challenges into innovative solutions. Through collaboration, creativity and strategic thinking, we’ve successfully delivered impactful projects that meet our clients' unique needs. Our projects highlight the diverse range of industries we serve

Optimization of ASU

Scope:

  • Increase the gaseous production capacity or reduce the specific energy consumption (without and with CAPEX).

  • Overall Optimization will be achieved in following 3 phases

    • Phase 1: Capacity enhancement of Gaseous Oxygen without CAPEX

    • Phase 2: Energy optimization without CAPEX

    • Phase 3: Energy Optimization or capacity enhancement with CAPEX

Duration:
1 Month
Deliverables:
The average Gaseous Oxygen flow produced due to the warm part optimization is 3.72% higher than the baseline value agreed.
Challenges:

  • Very Tight Schedule for warm- part optimization

  • Delay in following phase of the project

IG.png
Operational Training

Scope:
Operational Training Program in Cryogenic Air Separation Units
Duration:
1 Month
Deliverables:

  • 1800 TPD Air Separation Unit with Argon production and associated cryogenic storage & distribution system at Ballari

  • 3 Air Separation Units at Jamshedpur; one 875 TPD with argon production, one 900 TPD with argon and one 900 TPD without Argon production and associated cryogenic storage & distribution system.

Challenges:
To improve the technical and operational competencies of the operational teams at both Ballari and Jamshedpur plants

Operational Training.jpg
HAZOP Study

Scope:
The scope of the study covers the ATB phase 2 expansion-tank farm facilities in Johor, Malaysia. The concept involves investigating how the plant might deviate from the design intent.
Duration:
1 Month
Deliverables:

  • Preventive measures are provided for the identified hazards.

  • Recommendations are provided to mitigate the identified problems.

Challenges:

  • Very tight schedule for overall project completion.

  • Highly experienced project & operational teams.

  • The client wanted a thorough and deep analysis.

hazp.png
n2.png
Feasibility Study for Pure N2

Scope:
Gaseous Nitrogen production by enriching Waste Nitrogen
Duration:
2 Months
Deliverables:
Technical feasibility Production of Gaseous Nitrogen from the enrichment of waste nitrogen is as follows:

  • Pure Nitrogen plant with LIN injection.

  • Pure Nitrogen plant without LIN Injection (using Liquefier).

Challenges:

  • To produce pure Gaseous Nitrogen technically, operationally and economically feasible at the rate of 25,000 Nm3/ hr (net) without using LIN.

  • Specific power consumption should be maintained as low as possible.

  • All the equipment shall fit in the available plant layouts.

bottom of page